Chennai Metro: 130-Metre Skywalk To Link Vadapalani Phase I & II By Mid-2025, Construction To Begin Soon

Last Updated:

To make switching between Phase I and Phase II easier, Chennai Metro Rail will build a skywalk linking the two Vadapalani stations.

Vadapalani is a key station as it connects the 54 km Phase I and 118.9 km Phase II networks. (Representational Image: PTI)

Chennai Metro is all set to make travel simpler for passengers moving between Poonamallee and Chennai Central.

Having said that, a new skywalk is being built to connect the old (Phase I) and new (Phase II) Vadapalani stations, allowing commuters to switch lines without stepping onto the road.

What’s Happening with Chennai Metro Phase II?

As per The Hindu, this skywalk will be a key feature for those using the busy Vadapalani station, which links the 54 km Phase I and the 118.9 km Phase II networks of the Chennai Metro.

The first part, from Poonamallee to Porur, will open later this year. Next year, the stretch from Porur to Vadapalani and Kodambakkam will be ready for passengers.

The walkway will lead passengers straight from the ticketing level of Phase II to that of Phase I. This means travellers no longer have to exit one station, cross the road, and enter another – saving time and offering added safety and comfort.

Chennai Metro Rail Limited (CMRL) has already invited bids for the skywalk project. It will take about three months to select a contractor and another six months to complete the build. The skywalk will cost nearly Rs 10 crore and is part of the overall project budget.

The walkway will be approximately 130 metres long and 6 metres wide, fully covered for commuter comfort and safety. Since Vadapalani station is due to open next year, CMRL has planned to start the skywalk construction immediately to ensure it’s ready for public use in time.

Get the latest updates on car and bike launches in India — including reviews, prices, specs, and performance. Stay informed with breaking auto industry news, EV policies, and more, Also Download the News18 App to stay updated!
News auto Chennai Metro: 130-Metre Skywalk To Link Vadapalani Phase I & II By Mid-2025, Construction To Begin Soon
  • Related Posts

    What are the benefits of chauffeur driven car rental Mumbai?

    benefits of chauffeur driven car rental Mumbai Choosing a chauffeur driven car rental Mumbai offers numerous advantages that go beyond simple transportation. In a busy and vibrant city like Mumbai,…

    Mumbai Flyers, Check For New Airport Code ‘NMI’: How Different Is It From BOM? Ticket Booking, Departure Tips | Mumbai-news News

    Last Updated:September 17, 2025, 12:27 IST According to the International Air Transport Association (IATA) website, NMIA has been assigned the three-letter location code ‘NMI’. The Navi Mumbai International Airport (NMIA)…

    Leave a Reply

    Your email address will not be published. Required fields are marked *

    You Missed

    When should I seek legal advice for Workplace discrimination?

    • By admin
    • July 2, 2026
    • 53 views

    What is included in an adversarial assessment?

    • By admin
    • May 29, 2026
    • 62 views

    How can I win an unjust dismissal Canada case?

    • By admin
    • May 4, 2026
    • 61 views

    웹사이트 검색누락 키워드 넣어야 하나요?

    • By admin
    • April 21, 2026
    • 63 views

    좌석 종류는 강남달토가 다양한 편이야?

    • By admin
    • April 2, 2026
    • 58 views

    강남 가라오케 낮에도 열어요?

    • By admin
    • March 23, 2026
    • 72 views